Project Description:
SPT Architecture teamed with USD 460 Hesston to provide pre-bond services to prepare for a proposed $33.4 million bond campaign. The bond passed in August 2022. The project features a two-story addition to the existing High School, a new classroom configuration which allows for natural lighting throughout, and these additional improvements:
- Storm Shelter Addition
- New Classrooms for HMS & HHS
- Separate Entries for HMS & HHS
- New Fine Arts Wing
- 700-Seat Auditorium
- New Band Room (Storm Shelter)
- New Music Room (Storm Shelter)
- Functional Stage with optimal site lines
- Renovated Industrial Arts/Vocational Classrooms will double size of existing space
- Updated Kitchen and Cafeteria to accommodate Grade Levels 5-12
- New High School Entry
- New Practice Gym
- New Locker Rooms
- New Weight Room
- New Bus Drive
Project Details:
Location:
Hesston, KS