USD 460 Hesston Bond Projects

USD 460 Hesston
USD 460 Hesston
USD 460 Hesston
USD 460 Hesston
USD 460 Hesston
USD 460 Hesston
USD 460 Hesston
USD 460 Hesston
USD 460 Hesston
USD 460 Hesston
previous arrow
next arrow
USD 460 Hesston
USD 460 Hesston
USD 460 Hesston
USD 460 Hesston
USD 460 Hesston
previous arrow
next arrow

Project Description:

SPT Architecture teamed with USD 460 Hesston to provide pre-bond services to prepare for a proposed $33.4 million bond campaign. The bond passed in August 2022. The project features a two-story addition to the existing High School, a new classroom configuration which allows for natural lighting throughout, and these additional improvements:

  • Storm Shelter Addition
  • New Classrooms for HMS & HHS
  • Separate Entries for HMS & HHS
  • New Fine Arts Wing
  • 700-Seat Auditorium
  • New Band Room (Storm Shelter)
  • New Music Room (Storm Shelter)
  • Functional Stage with optimal site lines
  • Renovated Industrial Arts/Vocational Classrooms will double size of existing space
  • Updated Kitchen and Cafeteria to accommodate Grade Levels 5-12
  • New High School Entry
  • New Practice Gym
  • New Locker Rooms
  • New Weight Room
  • New Bus Drive

Project Details:

Location:

Hesston, KS

Category:

Education, K-12 Education